Operations and Maintenance

Key Points.

  • Once a fault is confirmed and localized, a request to mobilise the ship is sent to the Marine Maintenance Centre (MMC).
  • Ship has an agreed time to prepare and sail for the repair site.
  • Upon sailing, she will have sufficient supplies to allow at least 30 days at sea.
  • During the transit to site, the ship will develop a detailed method of procedure that will be used during the repair process.

 

 
   
   
 
Close