Key Points.
- Once a fault is confirmed and localized, a request to mobilise the ship is sent to the relevant ship operator.
- Ship has an agreed time to prepare and sail for the repair site.
- Upon sailing, she will have sufficient supplies to allow at least 30 days at sea.
- During the transit to site, the ship will develop a detailed method of procedure that will be used during the repair process.